Today is 2020-09-24 Thursday,Welcome to this site 


Industry Dynamics

Installation and Maintenance of Gangguo Bamboo (I)

Word:[Big][Middle][Small] QR Code 2019-3-27     Viewed:    

Bamboo floor installation generally adopts keel installation method:
1. Construction conditions: the floor must be dry; the floor must be level; other decorative construction must be completed.
2. keel installation:
1. Moisture-proof treatment should be done on the ground. Moisture-proof film is generally used, and the joint of moisture-proof film is connected with tape as a whole.
2. Use the wood which is not easy to deform as keel; determine the base keel according to the size of the board; the distance between keels is generally 250-300 mm; after the keel is paved, it should be basically on a horizontal plane, and the error should not exceed 3 mm;
3. Floor Installation:
1. Floor should be scattered and opened in the room three days before installation, to be fully consistent with the installation environment humidity; to understand the average annual air humidity of the floor installation site, to measure the moisture content of the floor, to determine the size of the installation gap of the floor according to the annual air humidity and the moisture content of the floor;
2. The floor should be paved with wrong seams. Measure the size and use the material reasonably. The cut section of the board must be sealed with varnish to prevent dampness.
3. Floor and wall must be with expansion joints, generally between 5-10 mm; generally can be installed in the corner of the way to reserve wooden strips first;
4. Large-area pavement should be artificially partitioned by "T" strip in the direction of a certain width and size according to the floor's expansion rate, in order to prevent the thermal expansion and cold contraction of the floor from deforming.
5. After the whole installation of bamboo flooring, stitching line is used around the roots of the wall, wood screw or floor nail is used to fix it, and near-coloured paint (or varnish) can be applied at the fixing place.
6. It is suggested that floor wax should be applied after installation.

Go Back
Print
0563-5036618
WeChat